Project Delivery Method Alternatives: What Owners Need to Know
ByThere are many ways for a design project to move from concept to completion, especially considering the variety of functions that learning environments serve. Selecting the right project delivery method is an integral part of the design and execution of smarter places for learning.
The right delivery method will vary based on your priorities, the type of project and the level of complexity involved. Each method has strengths and weaknesses. Based on our 60 years of collaborating with owners and construction professionals, here are some of the advantages and disadvantages of the primary delivery methods in use today.
Design-Bid-Build
Design-bid-build places your design needs at the forefront, providing ample time to develop design options from which the best solution can be identified, refined and construction documents completed before procurement of construction services. The most common ways in which Design-Bid-Build is delivered are with a General Contractor, Multiple Prime Contracts and Construction Manager as Agent (CMa). Each approach follows the same primary steps of project design, competitive bidding and construction. There are however subtle differences in decision-making with each delivery method.
General Contractor
In this design-bid-build delivery, the owner selects an A/E to design the building. Following completion of the design process and construction documents, a single General Contractor (GC) is then selected by the owner through a competitive bidding process. The owner holds a single construction contract for all work with the GC.
Advantages
|
Disadvantages
|
Multiple Prime Contracts
This design-bid-build delivery is similar to a General Contractor. The difference is that the project is bid in separate packages typically defined by construction trades, and bids are awarded to multiple prime contractors. The owner holds a separate contract with each prime contractor, and the Contractor for General Trades (typically a General Contractor) is assigned responsibility for coordination during construction.
Advantages
|
Disadvantages
|
Construction Manager as Agent (CMa)
In this design-bid-build delivery, the owner hires the Construction Manager as Agent (CMa) through a qualifications-based selection process that occurs at the beginning of design. The CMa provides estimates during design, assists with bidding and coordinates with prime contractors during construction. The owner bids and holds all prime contracts for construction.
Advantages
|
Disadvantages
|
Construction Manager as Constructor (CMc) – also referred to as Construction Manager at Risk
In the Construction Manager as Constructor delivery, the owner hires a Construction Manager at the beginning of design through the best value selection process where qualifications and fees may be considered. The CMc provides a Guaranteed Maximum Price (GMP) either prior to or following bidding. The CMc bids to prequalified subcontractors then executes a single contract with the owner for all construction work.
Advantages
|
Disadvantages
|
Design-Build
At the onset, an architect or engineer is hired by the Owner as Design Criteria Developer for the Design-Builder selection process. Design-Builders are then chosen through a qualifications-based selection process and are given the opportunity to offer a proposal in response to the Design Criteria.
Proposals are scored by the Owner’s Technical Review Committee based upon a previously published scoring system that is a combination of qualitative and cost considerations. The successful Design-Builder enters into a contract for all design and construction work.
Advantages
|
Disadvantages
|
Choose the Right Process for Your Projects
It is important to note that in all delivery processes, contractual protections are present so that the owner can be assured that the project will be delivered within the stated budget. The opportunity for changes in work as a result of unforeseen conditions, conflicts in the design, and owner-requested modifications can occur in each case and are effectively managed by incorporating appropriate contingency funds.
To better understand the differences as well as the advantages and disadvantages of each, you need to consult a design professional that has experience in all delivery methods to discuss your particular project needs and arrive at the one that is best for your project
Designing School-Based Health Centers
By Dan ObrynbaSchool-based health centers are becoming integral components of public schools, primarily serving the needs of students and staff, with the potential to also serve the broader community. School-Based Health Centers are usually run by separate
Full ArticleEsports Facilities for Student Engagement
By Steven HerrAs competitive esports becomes a viable career path, educators across the country are embracing these gaming trends and expanding esports programming at their schools. Schools that have adopted esports are already seeing the benefits. According
Full ArticleSmart Schools Roundtable: School Safety by Design
By Zachary SprungerThe tragedy at Robb Elementary School in Uvalde, Texas, has once again brought the issue of school security into the national conversation. In 2020, Fanning Howey hosted a school security webinar featuring Michael Dorn, Executive
Full Article